Rough Drain Excavation Plumbing

This basement was excavated using heavy machinery and the floor level was lowered by 1 foot. All the old drain pipes were subject to corrosion and thus, replaced.

Furthermore, in this plumbing project, the pipe lines were equipped with a backwater valve. So that during heavy rainfalls, flooding in the house is prevented.

Finally, concrete slabs were used to construct the floor.

Location:

NDG, Montreal, Quebec

Year:

2015

Category:

Plumbing

Tags:

House