In this project which was conducted in 2018, the garage floor, which was cracked at multiple locations, was completely removed and the plumbing system and pipes were fully renovated. As can be seen in the photos, a drain pipe was also installed at the entrance.
Montreal, Quebec
2018
Plumbing, Videos