Installation of moldings and replacing carpet floors with laminate and sand stain warmish stairs to match the floor color and theme. This renovation project, in a duplex house in Verdun, was completed in 1 week....
The main drain pipe was clogged and broke. After camera inspection we found out that the pipes of these building belong to 1948 and were made of clay. So we replaced them with ABS and also installed a backwater valve to prevent flooding....
In this project which was conducted in 2018, the garage floor, which was cracked at multiple locations, was completely removed and the plumbing system and pipes were fully renovated. As can be seen in the photos, a drain pipe was also installed at the entrance....
Previously, the backyard of this house had an entrance to the kitchen by a deck. We moved this entrance to the right, and in the procedure, we extended the deck as well.
You can see the photos of the kitchen on this page....
In this innovative plumbing / bathroom renovation project, our team renovated the Men's bathroom of an Irish Pub in Old Dublin, Montreal. You can see photos from before, during and after the renovation.
In only 4 days, we completely renovated the plumbing system, installed new tiling and most importantly, added new custom-made urinals. We designed these amazing urinals from beer barrels, had them built in a workshop and installed them for this project....